Tianhecheng's new production line was officially completed on July 1, 2018 and officially put into operation in November 2019. The new production line has a total construction area of 2,800 square meters, of which the production room covers an area of 1,600 square meters. The first floor is a 100,000-level purification workshop, and the whole production process is set up to visit the channel. The layout and structure are strictly in accordance with GMP standards, which can effectively prevent cross-contamination; the second and third floors are power workshops, and the equipment that comes into contact with materials is made of 304 stainless steel or 316 stainless steel, which effectively ensures the safety and reliability of the product.
2800m²
Total construction area of the new production line
1600m²
Production workshop area
100000
100,000-level purification plant
GMP
Standard requirements
Ensure that all products leaving the factory are qualified, unqualified products are controlled in the enterprise. Through testing of new products and semi-finished products during the production and processing, data support is provided, so that the R & D and production departments can improve and achieve the purpose of improving product quality.
Conduct inspections of raw materials, semi-finished products, finished products, production water, tools, workshop personnel and environment used in production and processing, and provide corresponding inspection records and sample retention records.
Pay attention to cultivating the testing skills of experimenters and the cultural construction of the laboratory team. The commissioning of the new quality control center has increased the highlights of corporate publicity, enhanced the corporate image, and let customers know Tianhecheng able and determined to ensure the quality and safety of its products.
Tianhecheng's new quality inspection center was officially put into use in October 2021. Based on its own work, it also provides data support to other departments. The new quality inspection center has a construction area of 500 square meters and has 3 liquid chromatographs, 2 gas chromatographs, 1 atomic fluorescence photometer, 1 atomic absorption photometer, 2 ultraviolet spectrophotometers, 6 biochemical incubators, 1 microwave digestion instrument, 2 drug stability test chambers and other supporting equipment for daily experiments, scientific research and personnel training for visitors to visit and communicate.